HIGHPOINT STAGE 3 AESTHETIC UPGRADE

A multifaceted aesthetic upgrade has been undertaken at Highpoint Shopping Centre, in collaboration with The GPT Group and Lockbridge. The upgrade involved significant invasive works, including reshaping voids, replacing balustrades, removing the existing lift, and installing a brand new lift within a steel glazed lift shaft. This aesthetic upgrade, known as Stage 3, is part of the ongoing enhancement works at the shopping centre. The project involved upgrading services and replacing over 2,900m² of flooring with new tiles that match the existing flooring scheme. The project was delivered through a design and construct (D&C) approach, divided into four separable portions. All activities were carried out overnight to ensure the safety and uninterrupted functioning of the trading floors by the next morning. Designed by Carr Design, the $6.8 million project was completed in April 2023 are the results are truly outstanding.

Details

Client :

The GPT Group

Location :

Highpoint Shopping Centre, Maribrynong

Architect :

Carr Design

Superintendent :

Lockbridge

Delivered with quality